Waterrail Roofing Services
Gutter Relining Services
HOME OTHER SERVICES ABOUT US Main website CONTACT US
Contact us now on 07795 972 663
The following project details work undertaken by Waterrail for Whitcombe Racing Stables, Near Dorchester, Dorset
Indoor Equestrian Centre
CUSTOMER : Whitcombe Racing Stables
CATEGORY : Over Roofing Services
Refurbishment of Indoor Equestrian Centre with 1600 sq metres of 80mm thick Corus Panels and Profiles Olive Green Trisomet composite panels and 200 sq. metres of Brett Martin trilite Energysaver triple skin factory assembled rooflights
Single skin big 6 asbestos cement sheeting with chequerboard rooflights replaced using 1600 sq. metres of 80mm thick Corus Panels and Profiles Olive Green Trisomet composite panels and 200 sq. metres of Brett Martin trilite Energysaver triple skin factory assembled rooflights with reinforcement underlap strip. Temporary internal safety nets where deployed during the contract and internally tarpaulins were laid onto the arena to catch debris in particular the old cropped fixings. The works where undertaken in sections with handrail linked mobile towers used to minimise impact on the stables daily operations.
BEFORE
AFTER
Project Images
 
Waterrail Brochure
Download Waterrails brochure for printing off! Just click here.
Waterrail Brochure
© Waterrail Roofing Services 2008